You are on PERI's international website. Click here to switch to PERI USA. Click here to view all PERI websites.

JKG Tower at Jalan Raja Laut, Malaysia

Project data

Locatie: Kuala Lumpur, Maleisië

  • JKG Tower high-rise complex, 32-storey office tower and 13-storey parking facility
  • Completion of shell in approx. 26 months

Vereisten

  • High safety requirements
  • Tight schedule called for completion of 3 floors per month
  • Tight budget restraints
  • Varying floor heights of 4.30 m through to 6.00 m
  • Different slab thicknesses of up to 1 m

Klantgegevens

/master/projects/jkg-tower-at-jalan-raja-laut

Voordelen voor de klant

  • Increased safety and productivity through trained and safe handling of the PERI systems
  • Pleasant, stress-free and safe working conditions at great heights through an air-permeable enclosure
  • Mobile self-climbing devices for the protection panel reduced all crane requirements
  • Fast storey construction time of 3 floors per month
JKG Tower: Kim Fook Wong, Construction Manager
Kim Fook Wong
Construction Manager

Together with the PERI engineers, we developed a very effective and efficient solution for this unique project. Thanks to the PERI system solutions, we could maintain the fast construction cycles. The PERI RCS P climbing protection panel also enhanced the safety measures on the jobsite. In addition, the support provided by PERI regarding the organization and implementation of on-site safety training increased the all-round safety for the construction crew as well as raising the productivity.

PERI oplossing

  • Complete solution, complemented by planning services and a PERI supervisor on site
  • Individual safety training for the construction team on the jobsite
  • Fast and cost-effective realization of the core walls with VARIO GT 24 girder wall formwork on CB 240 climbing brackets
  • Adapting to project-specific requirements with PERI RCS rail climbing system
  • RCS P climbing protection panel as anti-fall protection at great heights
  • Easy adaptation to suit the varying floor heights of 4.30 m to 6.00 m with PERI PD 8 slab tables